Customization: | Available |
---|---|
Tolerance: | +/-0.02mm |
Machining Method: | CNC Machining |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Quality CNC OEM Machining Supplier
|
||||
Service
|
CNC Turning, CNC Milling, Laser Cutting, Bending, Spinning, Wire Cutting, Electric Discharge Machining (EDM), Fire cutting,
|
|||
Materials
|
Aluminum: 6000 series, 7000 series, 5000 series, etc.
|
|||
Stainless steel: SUS201,SUS303, SUS304, SS316, SS316L, etc.
|
||||
Steel: C45/1214L/1215/1045/4140/SCM440/40CrMo/42CrMo, etc.
|
||||
Brass: 260, C360, H59, H60, H62, H63, H65, H68, H70, Bronze, Copper
|
||||
Plastic: POM/PA/Nylon/PC/PMMA/PVC/PU/Acrylic/ABS/PTFE/PEEK etc.
|
||||
Surface Treatment
|
Anodizing, Bead blasting, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/ Plating, Brushing, Painting, Powder Coating, Heat
treating, Blackening, Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave etc. |
|||
Tolerance
|
+/-0.01mm (+/-0.0003") or customized
|
|||
Roughness
|
Min Ra0.1~3.2
|
|||
Drawing format
|
Stp, Step, Igs, Solidworks, AutoCAD(DXF, DWG), PDF, or Samples
|
|||
Lead Time
|
1-2 weeks for samples, 3-4 weeks for mass production
|
|||
Quality Assurance
|
ISO9001:2015, TUV,
|
|||
Inspection
|
100% inspection before shipping
|
|||
Payment Terms
|
30% Deposit +70% Balance,Trade Assurance, TT, LC
|
1.Are you a manufacturer or a trading company?
We are a factory located in Jieyang, China since 1994, workshop are 38000 square ft (3500 square meters) |
|
|
|
|
||||
2.How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information. |
|
|
|
|
||||
3. Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation. |
|
|
|
|
||||
4.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need. |
|
|
|
|
||||
5. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible. |
|
|
|
|
||||
6. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production. Depends on the drawing and quantity. |
|
|
|
|
||||
7. How do you control the quality?
(1) Material inspection--Check the material surface and roughly dimension. (2) Production first inspection--To ensure the critical dimension in mass production. (3) Sampling inspection--Check the quality before sending to the warehouse. (4) Pre-shipment inspection--100% inspected by QC assistants before shipment. |
|
|
|
|
||||
8. What will you do if we are no satisfied with the quality?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap |
|
|
|
|